288 riders/hr
2-Train Ops
Operations
—
Operating Mode
Avg Cycle Time
3:25
Rolling avg · last 10 dispatches
Capacity
288riders/hr
18 trains/hr · 16 riders
Trains / Hour
18
Theoretical at current cycle
Queue Wait
~22min
Based on last AI scan
Line Cut Predictor
✂
Cut Line At
—
Targeting 5:00 PM close
Park close 5:00 PM · No buffer applied
Cycle Logger
Track dispatch intervals and crew assignments
Dispatch Timer
0:00.0
Ready
Crew Assignments
Today's Log
No dispatches logged yet.
SOI Audits
Standard Operating Inspection · Universal Checklist
Audited Operator
0 Pass
0 Needs Impr.
0 Fail
Queue Vision
Photo-based rider count estimation
Analyze Queue Photo
Tap to upload · AI-powered rider count
How it works
Capture the queue from the Preload Op vantage point. AI estimates rider count, recommends 1-train vs 2-train ops based on queue density and current cycle time.
Break Sheets
Automated break rotation planner
Coming Soon
Automated Break Sheets
In the future, this feature will allow for automatic break sheet writing based on the daily location sheet and staff competencies. It will automatically detect schedule conflicts and export all break sheets as printable PDFs.
Assignments
Live staff tasks · visible to everyone